Construction & Trades

Day one.

Power on Site,

Construction sites, renovations, outdoor jobs — VASOL gives you reliable 230V power from the moment you arrive, before the grid is even connected.

How VASOL powers your workday

Worries about diesel generators being a daily hassle?


Refuelling, maintenance, noise complaints, exhaust fumes — and the cost adds up fast. VASOL runs silently on sunlight with zero running costs and zero maintenance.

Worries about waiting weeks for the grid connection?


The electrical hookup is booked for week six, but you need power from day one. VASOL gives you 230V power the moment you arrive on site — no waiting, no delays.

Worries about noise restrictions on urban sites?


Many municipalities have strict noise limits. A running generator can shut down your workday before 8am. VASOL produces zero engine noise — work anywhere, anytime.

Worries about generator hire costs piling up?


Renting a generator for 4–8 weeks adds thousands of kronor before the real work has even started. VASOL is a one-time investment you take from site to site for years.

Your site setup, step by step

1

Arrive on site, unload the system

The PGU and ESS come out of your van. Compact enough to carry in one trip.

2

Position the panels outside

Set the PGU on the ground, roof, or scaffold — anywhere with sun. Unfold the legs and point south. Under 2 minutes.

3

Place the ESS inside where you work

The battery unit goes indoors — completely safe with no fumes. Run the cable through a window or door gap.

4

Plug in your tools and get to work

Connect your extension lead to the 230V output. Plug in tools, lights, chargers. Work normally all day.

5

Pack up and take it to the next job

End of day, fold the panels, load both units in the van. Ready for the next site tomorrow morning.

Ready to get started?

Your off-grid
power awaits.

Order directly from our shop or reach out —

we'll help you find the right configuration for your situation.